Case study: Hillcrest Rise subdivision, stages 1 to 3
Client: residential developer. Scope: bulk earthworks, roads and drainage for 240 lots.
- Challenge
- Three stages had to be released on a fixed sales program, through the wettest summer in several years, on ground that held water.
- Solution
- We installed the trunk drainage first, staged the earthworks so finished lots shed water, and used machine guidance and daily survey checks so no area had to be reworked after rain.
- Outcome
- All three stages were released on program, the lots passed council inspection first time, and the developer engaged Tarnwick for stage 4.
"Through a very wet summer, Tarnwick kept every stage moving and handed over lots that passed first time."